Planning a Preschool Nature Playground? Start Here.
How do you get a preschool nature playground designed and built?
Start with a vision, then create a plan that fits your site, budget, and educational goals.
Most preschool directors begin with ideas—not construction drawings.
They’ve collected inspiration, toured other schools, or know they want more outdoor learning.
The challenge is knowing what to build, what it will cost, and how to turn those ideas into a safe, lasting playground.
This guide explains the same process we use with our clients—from the first conversation through construction.
Book a complimentary introductory call to discuss your site, goals, and budget.

How Do You Know It’s Time for a Nature Playground?
If your playground no longer supports the learning experience you want to provide, it’s time to start planning.
Many of our clients are:
- Replacing aging playground equipment
- Expanding their preschool
- Planning a fundraising campaign
- Looking for more outdoor learning
- Attracting new families
- Reimagining underused outdoor space
If that sounds like your school, you’re probably ready to begin.
OUR PROCESS
What Happens After We Contact Learning Landscapes Design?
Our professional project managers guide your project from the first idea to a completed playground.
Every project is different, but most follow the same path:
Introductory Call→ Proposal from Us → Vision Meeting → Concept Plan → Budget → Fundraising (if needed) → Construction Documents → Permits (if needed) → Contractor Bidding → Construction
A clear design process helps your team make confident decisions and avoid expensive surprises.
Why Do Nature Playground Projects Stall?
Most projects don’t stall because of funding—they stall because there isn’t a clear plan.
Beautiful inspiration photos don’t answer questions like:
- What fits our site?
- How much will it cost?
- Do we need permits?
- Can we build in phases?
- What will a contractor need?
A concept plan answers those questions before major construction dollars are spent. It creates a shared vision, establishes a preliminary budget, and becomes the roadmap for fundraising, permitting, and construction.

CONCEPT DESIGN
What Is a Preschool Nature Playground Concept Plan?
A concept plan turns your ideas into a realistic, buildable vision.
Together, we’ll identify the play experiences that best support your children and organize them into a cohesive master plan.
A concept plan typically includes:
- Playground layout
- Nature play and outdoor learning areas
- Preliminary construction budget
- Phasing recommendations
- Graphics for fundraising
- A roadmap for design and construction
Whether you build everything at once or over several years, a concept plan helps you invest wisely and move forward with confidence.

What Does a Preschool Nature Playground Include?
The best nature playgrounds offer many different ways for children to play, learn, explore, and connect with nature.
Instead of starting with playground equipment, we begin by identifying the experiences you want children to have. Every school is different, but most preschool nature playgrounds include a mix of the following:
Active Play
Children build confidence and coordination through hills, balance trails, boulders, climbing features, and open spaces for running and movement.
Sensory Play
Sand, water, mud kitchens, loose parts, and natural materials encourage creativity, STEM learning, and open-ended exploration.
Outdoor Learning
Gardens, gathering spaces, nature trails, and outdoor classrooms extend learning beyond the walls of your school.
Imaginative Play
Playhouses, stages, fairy villages, forts, and dramatic play areas encourage storytelling, collaboration, and child-led discovery.
Loose Parts Play
Fort building, potions making, sand exploration elements, and natural pieces. Loose parts come in so many forms and are an excellent wany to improve play value. See a full blog post on loose parts play here.
The goal isn’t to include every feature—it’s to create the right combination for your children, your curriculum, and your budget.
How Much Does a Preschool Nature Playground Cost?
Every project is different, but a concept plan helps determine what can be built within your budget.
One of the first questions we answer is, “What’s realistic?”
For planning purposes, many preschool nature playgrounds are budgeted at approximately $35 per square foot, although actual costs depend on:
- How complex your design is
- How big your site is
- Existing site conditions
- Utilities and drainage
- Accessibility improvements needed
- Grading
- Custom play features requested
- Planting and site amenities
- If you can salvage existing features like pathways, fencing, trees, and retaining walls.
Most concept plans for preschools range from $8,000–12,000 and provide a master plan, preliminary construction budget, and a roadmap for fundraising and implementation.
Rather than asking, “How much does a playground cost?” we help schools answer the more useful question:
“What can we build within our available budget?”
Can We Build the Playground in Phases?
Yes. Many of our preschool projects are completed over several years.
A phased approach allows schools to:
- Spread costs over multiple budget cycles.
- Coordinate with fundraising or grants.
- Minimize disruption to school operations.
- Prioritize the highest-value improvements first.
Because every phase is planned from the beginning, each new investment builds toward one cohesive outdoor learning environment instead of becoming a collection of disconnected projects.
Do We Need a Playground Designer?
If you’re adding a few nature play features from a catalog, probably not. If you’re creating a custom outdoor learning environment, professional design usually saves time, money, and costly changes.
Professional design is especially valuable when your project includes:
- Custom climbing features
- Hills, grading, or retaining walls
- Sand or water play
- Plumbing or drainage
- Accessibility improvements
- Outdoor classrooms
- Permitting
- Contractor bidding
- Phased construction
Our role is to coordinate all of those pieces into one clear, buildable plan that reflects your educational philosophy and gives contractors the information they need to price and build the project with confidence.
Can a Nature Playground be Safe?
Yes—when it’s thoughtfully designed using current playground safety guidelines, maintained well, and utilizing age-appropriate design.
Natural playgrounds aren’t about eliminating challenge—they’re about creating opportunities for children to build confidence through appropriate levels of risk.
During design, we consider:
- Age-appropriate play
- Fall protection
- Accessibility
- Supervision
- Durable materials
- Long-term maintenance
For a deeper look at safety considerations, explore our article on Playground Safety in Natural Play Environments.
What About Maintenance?
A well-designed nature playground is easier to maintain because maintenance is considered from the beginning.
Typical maintenance includes:
- Seasonal pruning
- Mulch replenishment
- Sand maintenance
- Playground inspections
- Caring for plants and gardens
- Cleaning water play features
Selecting durable materials and planning for maintenance during design helps reduce long-term costs and keeps the playground looking its best. We also have additional resources on natural playground materials and long-term maintenance for schools.
Frequently Asked Questions
How much does a preschool nature playground cost?
Every project is different, but many schools begin with a concept plan and a preliminary planning budget of about $35 per square foot. Final construction costs depend on site conditions, grading, utilities, accessibility improvements, drainage, and custom climbing features. A concept plan helps you understand what can be built within your available budget.
Can we build our playground in phases?
Absolutely. Many preschool nature playgrounds are built over several years. A master plan allows you to prioritize improvements, coordinate fundraising and grants, and complete construction in logical phases while maintaining one cohesive vision.
Do we need permits?
Sometimes. Projects that include grading, retaining walls, utilities, drainage, structures, or other site improvements may require permits or licensing review. We help identify those requirements early so your project moves forward with fewer surprises.
Can local contractors build a nature playground?
Yes. We prepare construction drawings and specifications that qualified local contractors can bid and build. We also provide construction support when needed to help ensure the finished playground reflects the approved design and meets applicable safety and licensing requirements.
There are often pieces communities can do with volunteers too!
In what states do you design nature playgrounds?
We work all over the US. Learning Landscapes Design works with preschools, schools, parks, and nonprofit organizations throughout the United States. With offices in Oregon and Wisconsin, we collaborate with local consultants and contractors to create site-specific nature playgrounds nationwide.
Alaska
Arizona
Arkansas
California
Colorado
Connecticut
Delaware
Florida
Georgia
Hawaii
Idaho
Illinois
Iowa
Kansas
Kentucky
Louisiana
Maine
Maryland
Massachusetts
Michigan
Minnesota
Mississippi
Missouri
Montana
Nevada
New Hampshire
New Jersey
New Mexico
New York
North Carolina
North Dakota
Ohio
Oklahoma
Oregon
Pennsylvania
South Carolina
South Dakota
Tennessee
Texas
Utah
Vermont
Virginia
Washington
West Virginia
Wisconsin
Wyoming
Can we keep some of our existing playground equipment?
Often, yes. Many projects combine existing equipment with new nature play, outdoor learning, planting, and gathering spaces. Reusing quality equipment can stretch your budget while creating a more engaging and cohesive outdoor environment.
What if our budget is limited?
You don’t have to build everything at once. Some schools begin with planting, loose parts, or a few high-impact nature play features, while others complete larger transformations over time. A concept plan helps identify the improvements that will have the greatest impact within your budget.
How long does the design process take?
Most concept plans are completed in a 4-6 weeks, while larger projects that include construction documents, permitting, and bidding take longer. During our introductory call, we’ll discuss your schedule and develop a timeline that fits your project goals. At any one time we can take on a few rush projects and get your project turned around in a few weeks.
Complete Project Examples for Natural Playgrounds in Preschools
Included On This Page
- Planning a Nature Playground
- Are you Ready?
- Our Process
- Why Projects Stall
- Concept Plan
- What Does a Nature Playground Include?
- Cost
- Building in Phases
- Do we Need a Designer?
- Safety
- Maintenance
- FAQs
- Why Learning Landscapes Design
- Meet Michelle
Preschool Nature Playground Planning at a Glance
Looking for quick answers?
- Project Type: Preschool nature playgrounds & outdoor learning environments
- Typical Concept Design: $8,000–12,000
- Planning Budget: Approximately $35/sf
- Can projects be phased? Yes
- Work nationwide? Yes
- Need permits? Sometimes
- Can local contractors build it? Yes
- Free introductory call? Yes
Buttercup Hill Preschool Natural Learning Environment
Challenge – No physical play, a desire for lots more variety.
Solution – A series of natural play rooms.
Result – Happy kids with endless variety outside.
Sunstone Montessori School Playscape
Challenge – Aging equipment students of varying ages with lots of different play needs.
Solution – Two physical play area with graduated challenge and lots of sensory and imaginative support spaces.
Result – Something for everyone!
Montclair Community Pre-K Outdoor Learning and Play Environment
Challenge – A big space without much to do.
Solution – A loop path with education, play, and imagination station.
Result – An amazing inclusive preschool community asset.
Why Work With Learning Landscapes Design?
We help preschool directors turn ideas into playgrounds that can actually be built.
Our team combines landscape architecture, child development, playground safety, and outdoor learning into one collaborative design process.
We don’t sell playground equipment.
We help you create a roadmap that supports fundraising, budgeting, permitting, contractor bidding, and long-term success.
Whether you’re improving one corner of your playground or transforming an entire campus, we’ll help you move from inspiration to construction with confidence.
During our complimentary introductory call we’ll discuss:
- Your goals
- Your site
- Your educational philosophy
- Your budget
- Potential project phases
- The next best step
If we’re a good fit, we’ll prepare a design proposal that becomes the roadmap for your project.
Start the Design Process
Meet Michelle
“I’ve spent my career helping schools create outdoor environments where children can explore, imagine, and connect with nature. My favorite part of the project is when the client sees their vision come alive.”
Landscape Architect
24 Years Experience
Completes Projects Nationwide
Your go to for Presentations and Construction Support
Leads an AMAZING TEAM!














